Oakridge pilot exception review, week 5

Oakridge pilot exception review, week 5

A property maintenance team reviewing pilot exceptions

Exception review Oakridge Property Management Fernway Automation

Owner: Sam Okoro. Updated Oct 1, 2026.

Coverage through week 4

Oakridge Property Management 4 exceptions unresolved 1 urgent approval waiting

The weekly review of everything the Oakridge maintenance triage pilot could not complete on its own: what failed, what it changes in the design or the estimate, and the decision each exception needs. Prepared by Sam Okoro, lead consultant at Fernway Automation, with Ines Moreau, automation engineer, for Diane Foster, operations director at Oakridge Property Management. Review of October 1, 2026.

Pilot week5of 6, closes Oct 11
Requests handled735through week 4
Needed a person115logged, not patched by hand
Completed within the rules171of the first 214 requests

The pilot is in week 5 of 6 and closes on Oct 11, so these are to-date figures: the 735 requests are the weekly batches logged through week 4, and the six-week totals follow in the pilot report after Oct 11. Weeks 1 and 2 handled 214 requests, with 171 completed within the agreed rules and 43 waiting for a person. Week 3 handled 231 and 36 needed a person, 19 of them because no unit number could be matched. Week 4 handled 248 and 31 needed a person. The after-hours batch for week 4 handled 42 requests, routed 37 to the on-call coordinator under the approved rule and held 5 as possible emergencies.

Every logged exception has a status. Exception open means no fix is agreed yet, Assigned means an owner is working on it, Resolved means the fix is confirmed, and Out of scope means you agreed the pilot will not do it. Seven exceptions are logged for Oakridge.

Decision options for each exception

Every exception gets one of four decisions, recorded on its card with an owner. Nothing is patched by hand without a record.

Fix

Cause is a defect Design stays the same

Choose when the failure comes from wrong reference data or a slip in a rule, and the design is sound.

Example: Vendor outside approved list (Ravi Menon, Resolved). Eight plumbing requests were matched to vendors that are not on the approved list because the vendor list export held an old vendor name. The list was refreshed and a coordinator rerouted the eight requests.

Test. The next weekly batch shows no match to a vendor outside the list, and the card states what was changed.

Redesign

Cause is the process Changes design

Choose when the same failure will return because something around the pilot is the cause.

Example: Unmatched unit numbers (Ines Moreau, Assigned). Nineteen runs could not match a property because requests arrived with photos but no unit number. Fixing them by hand would have hidden that the tenant request form does not require one, so Diane agreed to make it required. The change has been live since Sep 28.

Example: Leak near electrical fittings (Ravi Menon, Assigned). Four requests mentioning water near light fittings or sockets were routed as normal plumbing. Ravi is adding an electrical hazard check to the rules for Diane to review. Until she approves it, such requests can still be classified as plumbing at normal priority.

Exclude

Outside the agreed scope Excluded from scope

Choose when doing the work would widen the pilot beyond what the sponsor agreed.

Example: Tenant message drafts (Sam Okoro, Out of scope). The pilot drafted replies to tenants for 12 requests. Tenant messaging is outside the agreed scope, so the drafts were discarded and the rule removed.

Example: Rent payment questions (Sam Okoro, Out of scope). Nine messages in week two were rent payment questions, which are not one of the six agreed request types. The pilot left them untouched and the front desk now forwards them to accounts.

Re-estimate

Cost or effort moves Changes estimate

Choose when an exception means phase two costs more or takes longer than the pilot suggested. These are caught before pricing, not after.

Example: Duplicate leak reports (Ravi Menon, Exception open). Three tenants in one building reported the same leak within an hour and three tickets were created for one issue. Duplicate detection is not in the agreed rules.

Example: Large photo attachments (Ines Moreau, Exception open). Photos above the inbox attachment size limit could not be opened, so 14 requests were classified from the text alone and routed with a note that images were not reviewed. This is blocked until the mail administrator raises the limit, requested Sep 24 and not yet done.

Exception patterns for Oakridge

Seven exceptions are logged for Oakridge and they touched 69 requests in total. Grouped by what caused them, they read as follows.

PatternRecordRequests affectedDesign impactOwnerStatus
No unit number on the requestUnmatched unit numbers19Changes designInes MoreauAssigned
Hazard wording read as routine plumbingLeak near electrical fittings4Changes designRavi MenonAssigned
One issue reported several timesDuplicate leak reports3Changes estimateRavi MenonException open
Photos the inbox cannot openLarge photo attachments14Changes estimateInes MoreauException open
Old reference dataVendor outside approved list8NoneRavi MenonResolved
Requests outside the six typesTenant message drafts (12) and Rent payment questions (9)21Excluded from scopeSam OkoroOut of scope

Design impact tells the sponsor what a pattern costs: Changes design means the rules or the form change, Changes estimate means phase two is priced differently, Excluded from scope means the pilot will not do it, and None means the fix needed no design change. A third item that changes the estimate, the vendor visit spend limit, sits in the approval log rather than on this board.

  • Oakridge exceptions closed out: 3 of 7 (1 resolved, 2 out of scope)
  • Oakridge exceptions logged with input, step and result: 7 of 7

I would rather see what the pilot cannot do now than find out in month two. Seeing the exceptions beside the decisions I owe makes the next conversation about phase two a lot simpler.

Diane FosterOperations director, Oakridge Property Management

Decisions for Diane

Sponsor decisions, in order of urgency
Approve or decline the emergency vendor dispatch for the burst pipe report received at 11:40 pm on Sep 30, held as a draft because vendor dispatch always waits for approval
Set a spend limit for routine vendor visits, open since Sep 25, with the reminder of Sep 29 unanswered, so every visit still goes to a coordinator
Review the electrical hazard check Ravi Menon is adding to the rules
Ask the mail administrator to raise the attachment size limit, requested Sep 24
Decide how duplicate leak reports should be handled before phase two is priced
Agree an after-hours response baseline before any second phase is scoped
✓Make the unit number required on the tenant request form, agreed in week three

The next weekly check-in is Tuesday, Oct 6. After two weeks of the new tenant form, Sam Okoro reviews the conversion checklist with Diane in the week of Oct 12 and checks whether unmatched requests have dropped.

Who is on this review

DFDiane FosterOperations director, Oakridge Property Management, sponsor
SOSam OkoroLead consultant, Fernway Automation, owns the decisions
IMInes MoreauAutomation engineer, Fernway Automation, logs and fixes exceptions

Demo deal room. Fernway Automation, Oakridge Property Management, the people and every figure are fictional sample data. Built on FuseBase.